Lots happening around here lately. I knew we were going to be doing wall wrap murals and graphics in the Family Life Center, but wasn't given directions. Then on a Monday, one of the bosses drops by the office and says basically, "oh, by the way, those murals and things need to be done by the first part of October - you can have the artwork done in two days, right?"
LOL - yeah, that's how it works the whole world over. High bar for expectations and almost always last minute details.
I spend two days with the decision maker trying to create a mockup that would make everyone happy for the new registration area. The FLC is a dual use building, so they wanted the graphics to be visible mostly if you're entering the main doors and not so much visible from the gym floor.
Original:
One of the many mockups:Final mockup:
Mockup view 2:
Directional wall which is also in that foyer:
Here's a shot of the final directional wall after installation:
And now I just need to get back there and get a shot of the completed registration area LOL
Comments
Post a Comment
Thanks for stopping by and for commenting. Now I know I am not alone in this great big world.